OEM
BYD Atto 3

Electric water pump assembly I

OE / Material Codes

13451444-00TA-1309010C
$62USD
In Stock
Quality availability
Need bulk or wholesale pricing?

Technical Specifications

Vehicle Model
BYD Atto 3
Steering Configuration
Universal (Left & Right-Hand Drive)

Shipping & Returns

Ships worldwide from Shanghai, China via air or sea freight. Standard delivery 5–30 business days, express 2–10 business days. Shipping cost is calculated at checkout.

7-day return window for unused items in original packaging. Contact us before returning any item.

Compatible VehiclesElectric water pump assembly I

BYDDolphin
2023–2025
BYDQin PLUS EV
2023–2024
BYDSeal
2023–2024
BYDYuan PLUS/Atto 3
2023–2025
BYDYuan UP/Atto 2
2024–2025
BYDSealion 05 EV
2025

Electric water pump assembly I Workshop GuideBYD Atto 3

Electric Water Pump Assembly I - Removal and Installation

Removal

  1. Discharge coolant. See Replacement of Coolant
  2. Remove the front motor lower mudguard assembly. See Front Motor Lower Mudguard Assembly - Removal and Installation
  3. Detach the pipeline connection of electric water pump assembly I.
  4. Disconnect 1 connector.
  5. Loosen 2 fixing clamps, and detach the connection between the plate heat exchanger inlet pipe assembly, the cooling pipe assembly 2 and the electric water pump assembly I.
  6. Remove 2 fixing bolts, and take out the electric water pump assembly I.

Installation

  1. The installation steps are opposite to the removal steps.

Caution After installation, check the pipeline joints to make sure there is no leakage. If any, the inspection and repair shall be carried out again.

Water Pipe Assembly in Motor Cooling Water Pump - Removal and Installation

Removal

  1. Discharge coolant. See Replacement of Coolant
  2. Loosen 2 fixing clamps, detach the motor cooling water pump inlet pipe assembly from the three-way water valve body assembly and the integrated intelligent front drive assembly, and take it out.

Installation

  1. The installation steps are opposite to the removal steps.

Caution After installation, check the pipeline joints to make sure there is no leakage. If any, the inspection and repair shall be carried out again.