Orisinil
BYD Atto 3

Rakitan pipa air pendingin

Kode OE / Material

13253857-00SC2E-8101280
$4USD
Tersedia
Ketersediaan kualitas

Selanjutnya:

  • Tinjau pilihan Anda di halaman keranjang.
  • Bayar langsung lewat Stripe (jika semua item ber-harga retail).
  • Atau kirim daftar sebagai penawaran untuk diskon grosir.

Spesifikasi Teknis

Model Kendaraan
BYD Atto 3
Konfigurasi Kemudi
Universal (Setir Kiri & Kanan)

Pengiriman & Pengembalian

Dikirim ke seluruh dunia dari Tiongkok melalui pengiriman udara atau laut. Pengiriman standar 5–30 hari kerja, ekspres 2–10 hari kerja. Biaya pengiriman dihitung saat checkout.

Jendela pengembalian 7 hari untuk barang yang belum digunakan dalam kemasan asli. Hubungi kami sebelum mengembalikan barang apa pun.

Kendaraan yang KompatibelRakitan pipa air pendingin

BYDDolphin
2021–2025
BYDYuan PLUS/Atto 3
2022–2025
BYDHan EV
2023–2025
BYDSong PLUS New Energy EV
2023–2025
BYDYuan UP/Atto 2
2024–2025

Rakitan pipa air pendingin Panduan BengkelBYD Atto 3

Cooling Water Pipe Assembly - Removal and Installation

Removal

  1. Power off the high voltage electrical system. See Power-off and power-on of high voltage electrical system
  2. Discharge coolant. See Replacement of Coolant
  3. Loosen 2 fixing clamps, and remove the cooling water pipe assembly.

Installation

  1. The installation steps are opposite to the removal steps.
  2. After the installation, fill in the coolant. See Replacement of Coolant

Caution After installation, check the pipeline joints to make sure there is no leakage. If any, the inspection and repair shall be carried out again.

Cooling Pipe Assembly 1 - Removal and Installation

Removal

  1. Discharge coolant. See Replacement of Coolant
  2. Remove the front motor lower mudguard assembly. See Front Motor Lower Mudguard Assembly - Removal and Installation
  3. Detach the 2 pipe clamps.
  4. Remove the cooling pipe assembly 1.
  5. Loosen 1 fixing clamp, and detach the cooling pipe assembly 1 from the integrated intelligent front drive assembly.
  6. Pry up a hold-open catch, and take out the cooling pipe assembly 1.

Installation

  1. The installation steps are opposite to the removal steps.

Caution After installation, check the pipeline joints to make sure there is no leakage. If any, the inspection and repair shall be carried out again.

Cooling Pipe Assembly 2 - Removal and Installation

Removal

  1. Discharge coolant. See Replacement of Coolant
  2. Loosen 2 fixing clamps, detach the cooling pipe assembly 2 from the electric water pump assembly I and the integrated intelligent front drive assembly, and take it out.

Installation

  1. The installation steps are opposite to the removal steps.

Caution After installation, check the pipeline joints to make sure there is no leakage. If any, the inspection and repair shall be carried out again.

Rakitan pipa air pendingin Diagram PemasanganBYD Atto 3

Diagram Pemasangan — Rakitan pipa air pendingin

Komponen lain dalam rakitan ini